Project consisted of removing shower tile, fixtures, vanity, floor tile, cabinet, and mirror. Repairs made to drywall. Installation of upgraded shower tiles (wall & floor), plumbing fixtures, vanity & top, floor tile, toilet, mirror, cabinet, and bath hardware.